Amit Minocha – 1st expert on this subject based on the ideXlab platform

  • profit evaluation of 2 out of 3 unit system for an Ash Handling Plant wherein situation of system failure did not arise
    Journal of Information and Optimization Sciences, 2007
    Co-Authors: Gulshan Taneja, Dalip Singh, Amit Minocha

    Abstract:

    2-out-of-3 unit Ash water pump system with no failed state is examined. The concept of inspection for detecting type of failure has been introduced. Unit may or may not be repairable on failure and hence is repaired or replaced accordingly. The expression for various measures of system effectiveness are obtained using semi-Markov processes and regenerative point technique. Some graphical study regarding profit has also been made. Real data have been collected and used for evaluating various economic related measures.

Rahul P Kurtadikar – 2nd expert on this subject based on the ideXlab platform

  • Automation of Ash Handling System with Event Logger
    International Journal of Computer Trends and Technology, 2014
    Co-Authors: A.s Wadhawe, Rahul P Kurtadikar

    Abstract:

    Parli thermal power Plant one of the old power Plants in MaharAshtra. This Plant are under control of MAHAGENCO (MSEB).Parli unit no.3 commissioned in 1984- 85.such old power Plant require renovation in order to increase efficiency and output. Main Plant renovation is done in 2004 by using HF CONROL DCS but most of the subsystem was not renovated. Such as coal Handling Plant, Ash Handling Plant, water treatment Plant etc. it is necessary that for Ash Handling Plant to be renovate, same done by me by using Programmable Logic Controller Allen Bradley micrologix 1500. Embedded I/O and expansion I/O are used.1769 IQ 32 module used as digital input channels.1769 IQ 32 module having 32 digital input. Another module is OW16, it is digital output module. Having 16 output channels and End cap or terminator is required at the end of last module. .

Gulshan Taneja – 3rd expert on this subject based on the ideXlab platform

  • profit evaluation of 2 out of 3 unit system for an Ash Handling Plant wherein situation of system failure did not arise
    Journal of Information and Optimization Sciences, 2007
    Co-Authors: Gulshan Taneja, Dalip Singh, Amit Minocha

    Abstract:

    2-out-of-3 unit Ash water pump system with no failed state is examined. The concept of inspection for detecting type of failure has been introduced. Unit may or may not be repairable on failure and hence is repaired or replaced accordingly. The expression for various measures of system effectiveness are obtained using semi-Markov processes and regenerative point technique. Some graphical study regarding profit has also been made. Real data have been collected and used for evaluating various economic related measures.