The Experts below are selected from a list of 34395 Experts worldwide ranked by ideXlab platform

Youngcheol Kang - One of the best experts on this subject based on the ideXlab platform.

Wonkyoung Seo - One of the best experts on this subject based on the ideXlab platform.

Khwaja Mateen Mazher - One of the best experts on this subject based on the ideXlab platform.

  • bim based Claims Management system a centralized information repository for extension of time Claims
    Automation in Construction, 2020
    Co-Authors: Hafiz Zahoor, Abdur Rehman Nasir, Rai Waqas Azfar Khan, Ahsen Maqsoom, Khwaja Mateen Mazher
    Abstract:

    Abstract In traditional Claim Management system, Extension of Time (EOT) Claims often lead to disputes among key construction stakeholders. This necessitates shifting traditional system to a digital environment for efficient processing. This research, therefore, focuses on utilizing Building Information Modeling (BIM) technology for developing a BIM-Based Claims Management System (BIM-CMS) to manage EOT Claims. Twenty-nine problematic issues in prevalent EOT Claim Management process are extracted through an extensive literature review and semi-structured interviews of industry experts. Using Application Programming Interface, a plugin is developed in Autodesk Revit for managing EOT Claims. The developed plugin is evaluated by industry's experts, who opined that BIM-CMS can be used to a great extent, as a tool to resolve most of the identified issues. It is also expected to proficiently mitigate potential disputes among contracting parties. The study also highlights barriers to BIM-CMS implementation and proposes corrective measures.

  • bim based Claims Management system a centralized information repository for extension of time Claims
    Automation in Construction, 2020
    Co-Authors: Hafiz Zahoor, Abdur Rehman Nasir, Rai Waqas Azfar Khan, Ahsen Maqsoom, Khwaja Mateen Mazher
    Abstract:

    Abstract In traditional Claim Management system, Extension of Time (EOT) Claims often lead to disputes among key construction stakeholders. This necessitates shifting traditional system to a digital environment for efficient processing. This research, therefore, focuses on utilizing Building Information Modeling (BIM) technology for developing a BIM-Based Claims Management System (BIM-CMS) to manage EOT Claims. Twenty-nine problematic issues in prevalent EOT Claim Management process are extracted through an extensive literature review and semi-structured interviews of industry experts. Using Application Programming Interface, a plugin is developed in Autodesk Revit for managing EOT Claims. The developed plugin is evaluated by industry's experts, who opined that BIM-CMS can be used to a great extent, as a tool to resolve most of the identified issues. It is also expected to proficiently mitigate potential disputes among contracting parties. The study also highlights barriers to BIM-CMS implementation and proposes corrective measures.

Azmi Ibrahim - One of the best experts on this subject based on the ideXlab platform.

  • improving construction Claim Management in malaysian construction industry
    6th International Conference of Euro Asia Civil Engineering Forum EACEF 2017, 2017
    Co-Authors: Nor Azmi Bakhary, Hamimah Adnan, Azmi Ibrahim
    Abstract:

    The construction industry in Malaysia is large and it involves multidisciplinary participants. There is high frequency of disputes arising from construction contract Claims. Even with the most expert understanding of construction contract clauses and the most equitable risk-allocation Management, Claims will continue to present problems if they are poorly managed in practice. The significantly increasing number of construction Claims indicates the need for the implementation of an effective construction Claim Management. This research aims to improve the process of Claim in construction industry. This research explores the problems related to the process of Claim from contractors’ and consultants’ point of view by studying common procedure of Claim Management. The findings highlight on the three key issues. There are Claim identification, Claim notification and Claim documentation. These issues are the most troublesome and contribute to the significant problems in construction Claim process. It also appears that a standard and transparent procedure should be put in place whereby contractors would be able to follow to properly prepare the Claim. In addition, staff awareness, training in how to document and submit a well-supported Claim, and negotiations with clients are becoming a necessity.

  • a study of construction Claim Management problems in malaysia
    Global Journal of Arts Education, 2014
    Co-Authors: Nor Azmi Bakhary, Hamimah Adnan, Azmi Ibrahim
    Abstract:

    Abstract The frequency of Claims is unavoidable given the nature of the contracts, their complexity, the number of parties involved, the risk and the pressure of time constraint in the preparation of the contract documents and the realisation of the work. The significantly increasing number of construction Claims indicates the need for the implementation of an effective construction Claim Management. This paper will look into Claim problems experienced by Malaysian contractors in construction projects. To achieve this, questionnaires survey were conducted involving the contractors and consultants. The findings indicate that the lack of site staff awareness to proactively detect Claims, inaccessibility or unavailability of relevant documents, and conflicts which arises during owner/contractor negotiation are all critical problems associated with the process of Claim Management. The problems observed from this research could be used to solve or improve the contractors’ Claim Management system.

  • critical review on improving the Claim Management process in malaysia
    Journal of Education and Vocational Research, 2013
    Co-Authors: Nor Azmi Bakhary, Azmi Ibrahim, Noor Akmal Adillah Ismail
    Abstract:

    Claims for additional costs and time extensions result from a variety of events occurring during the course of construction. To enhance the chances of success, contractors when submitting their Claims must closely follow the steps stipulated in the contract conditions, by providing a breakdown of alleged additional costs and time with sufficient documentation. This paper aims to provide a better insight on the process of Claims Management in the Malaysian construction industry. It is reviewing the early part of the PhD research and hopefully the findings will try to generate means of improving the Claims Management process. With the proper Claim Management framework, it is hoped that contractors can utilize it to improve their Claim Management process in the future.

Hafiz Zahoor - One of the best experts on this subject based on the ideXlab platform.

  • bim based Claims Management system a centralized information repository for extension of time Claims
    Automation in Construction, 2020
    Co-Authors: Hafiz Zahoor, Abdur Rehman Nasir, Rai Waqas Azfar Khan, Ahsen Maqsoom, Khwaja Mateen Mazher
    Abstract:

    Abstract In traditional Claim Management system, Extension of Time (EOT) Claims often lead to disputes among key construction stakeholders. This necessitates shifting traditional system to a digital environment for efficient processing. This research, therefore, focuses on utilizing Building Information Modeling (BIM) technology for developing a BIM-Based Claims Management System (BIM-CMS) to manage EOT Claims. Twenty-nine problematic issues in prevalent EOT Claim Management process are extracted through an extensive literature review and semi-structured interviews of industry experts. Using Application Programming Interface, a plugin is developed in Autodesk Revit for managing EOT Claims. The developed plugin is evaluated by industry's experts, who opined that BIM-CMS can be used to a great extent, as a tool to resolve most of the identified issues. It is also expected to proficiently mitigate potential disputes among contracting parties. The study also highlights barriers to BIM-CMS implementation and proposes corrective measures.

  • bim based Claims Management system a centralized information repository for extension of time Claims
    Automation in Construction, 2020
    Co-Authors: Hafiz Zahoor, Abdur Rehman Nasir, Rai Waqas Azfar Khan, Ahsen Maqsoom, Khwaja Mateen Mazher
    Abstract:

    Abstract In traditional Claim Management system, Extension of Time (EOT) Claims often lead to disputes among key construction stakeholders. This necessitates shifting traditional system to a digital environment for efficient processing. This research, therefore, focuses on utilizing Building Information Modeling (BIM) technology for developing a BIM-Based Claims Management System (BIM-CMS) to manage EOT Claims. Twenty-nine problematic issues in prevalent EOT Claim Management process are extracted through an extensive literature review and semi-structured interviews of industry experts. Using Application Programming Interface, a plugin is developed in Autodesk Revit for managing EOT Claims. The developed plugin is evaluated by industry's experts, who opined that BIM-CMS can be used to a great extent, as a tool to resolve most of the identified issues. It is also expected to proficiently mitigate potential disputes among contracting parties. The study also highlights barriers to BIM-CMS implementation and proposes corrective measures.